UCSB DFSS Contracting Services
Back to list

East Gate Installation

Posted 5/07/2007

Notes

Bid Opening Date changed from Friday, June 1, 2007 at 2:30PM to Friday, June 15, 2007 at 2:30PM per Addendum One.

Posted 5/29/2007


INFORMATION AVAILABLE TO BIDDERS The East Gate Soils Report is made available for the convenience of bidders and is not a part of the Contract. The information is provided subject to the provisions of Article 3 of the General Conditions.

Posted 5/30/2007


Bid Opening Date changed from Friday, June 15, 2007 at 2:30 PM to Tuesday, June 26, 2007 at 2:30 PM per Addendum Two.

Posted 6/14/2007


INFORMATION AVAILABLE TO BIDDERS The East Gate Existing Utility Crossings is made available for the convenience of bidders and is not part of the Contract. The information is provided subject to the provisions of Article 3 of the General Conditions.

Posted 6/14/2007


Drawings for Addendum Three, too large to post. Available at Trico.

Posted 6/15/2007