UCSB DFSS Contracting Services
Back to list

Elevator Modernization, Francisco Torres, San Miguel, San Rafael

Posted 7/23/2007

Notes

Addendum One changes the bid opening date to September 10, 2007 at 2:30PM. Also on Addendum one is a second scheduled mandatory pre-bid conference and mandatory pre-bid job walk on August 22, 2007 at 1:30P.M. Those who attended the conference on August 7, 2007 need not attend this second conference.

Posted 8/15/2007


Bid opening date changed from 9/10/2007 @ 2:30PM TO 9/17/2007 at 2:30PM per addendum three

Posted 9/06/2007


Attachments