UCSB DFSS Contracting Services
Back to list

Recreation Center Expansion Photovoltaic Panel System

Posted 10/31/2007

Notes

Addendum One released with Proposal Documents

Posted 11/08/2007


It is mandatory to either attend the Pre-Proposal conference or to view the Pre-proposal Conference Multi-Media Presentation (Power Point slide show). Any Proposer not attending the Pre-Proposal Conference or the Pre-Proposal Conference Multi-Media Presentation on-line will be deemed to have not complied with the requirements of the Proposal Documents and its Proposal will be rejected.

Posted 11/08/2007


When the University has determined the low Proposer, Proposer Identities will be revealed, posted on our website, and made public.

Posted 11/20/2007


ALRB Based on Base Proposal, extended amount of Compensable Delays (phase 1 & 2) and Alternate #4

Posted 11/27/2007


Bid Summary originally and correctly posted on 11/27/2007. An upgrade to the Internet Web site occurred on 11/29/2007, causing an error with the Bid Summary posting. Please phone 805/893-3356 if you would like a copy of the Bid Summary faxed to you. Internet Web site error corrected on 12/5/2007.

Posted 12/05/2007


SunTechnics Energy Systems, Inc. has withdrawn their proposal.

Posted 1/16/2008


Revised Apparent Lowest Responsible Proposer: Newton Construction & Management, Inc. based on Base Proposal and extended amount of Compensable Delay.

Posted 1/16/2008


Attachments

Posted 10/31/2007


Posted 11/07/2007



Posted 11/08/2007


Posted 11/14/2007


Posted 11/20/2007


Posted 12/05/2007