The University is in the process of evaluating the bid results. Bid results posted when the determination of award has been made.
            
            Posted 5/18/2010
          
          
          
            
Basis of Award:  Lump Sum Base Bid, plus the daily rate for compensable delay multiplied by the multiplier. Apparent Lowest Responsible Bidder:  EJS Construction, Inc.
            
            Posted 6/18/2010