UCSB DFSS Contracting Services
Back to list

Campus Hot Water Loop

Posted 8/13/2010

Notes

Design professionals interested in providing the design for the construction of the Campus Hot Water Loop which will utilize the available energy from a new heat pump, with 600 ton cooling capacity and 10 million BTU/HR of 155 degF heating water.

Posted 8/13/2010


Request For Proposals have been received and are under review by the University. The short-listed firms will be posted to this website when the review process is complete.

Posted 8/31/2010


Selected Firm: Goss Engineering

Posted 12/01/2010