Notice is hereby given that Diani Building Corp. (the University's selected CM/General Contractor) has determined that subcontractors bidding on the Project for the following trade packages must be prequalified prior to submitting a Bid on the Project:
Landscape & Irrigation;
Structural Concrete & Pile Foundations;
Rough Carpentry
Glazing and Storefront
Lath & Plaster
Drywall
Kitchen Equipment
HVAC & Controls
Plumbing
Electrical
It is mandatory that the subcontractors, who intend to submit a Bid on any of the above trade packages for this project (“Prospective Sub-Bidders”), fully complete the Prequalification Questionnaire (“PQQ”), provide all materials requested therein, and be pre-qualified by Diani to be on the final qualified Sub-Bidder’s list. Subtrades interested in bidding on a bid package not listed above do NOT need to submit a PQQ.
CONSTRUCTION DOCUMENTS:
The project drawings and specifications are going through a constructability review and design updates. It is anticipated that the final construction documents would become available for subcontractors bidding in March 2014.
PREQUALIFICATION DEADLINE:
Prequalification Questionnaires shall be submitted on or before the Prequalification Deadline by subcontractors interested in bidding on one or more of the listed Bid Packages:
DATE: February 25, 2014
TIME: 3:00 PM
Posted 1/31/2014