UCSB DFSS Contracting Services
Back to list

Subcontractor Prequalification - Faculty Club Renovation & Guest Room Addition

Posted 1/31/2014

Notes

Notice is hereby given that Diani Building Corp. (the University's selected CM/General Contractor) has determined that subcontractors bidding on the Project for the following trade packages must be prequalified prior to submitting a Bid on the Project: Landscape & Irrigation; Structural Concrete & Pile Foundations; Rough Carpentry Glazing and Storefront Lath & Plaster Drywall Kitchen Equipment HVAC & Controls Plumbing Electrical It is mandatory that the subcontractors, who intend to submit a Bid on any of the above trade packages for this project (“Prospective Sub-Bidders”), fully complete the Prequalification Questionnaire (“PQQ”), provide all materials requested therein, and be pre-qualified by Diani to be on the final qualified Sub-Bidder’s list. Subtrades interested in bidding on a bid package not listed above do NOT need to submit a PQQ. CONSTRUCTION DOCUMENTS: The project drawings and specifications are going through a constructability review and design updates. It is anticipated that the final construction documents would become available for subcontractors bidding in March 2014. PREQUALIFICATION DEADLINE: Prequalification Questionnaires shall be submitted on or before the Prequalification Deadline by subcontractors interested in bidding on one or more of the listed Bid Packages: DATE: February 25, 2014 TIME: 3:00 PM

Posted 1/31/2014


Attachments

Posted 1/31/2014