<a href="http://facilities.ucsb.edu/contracts/edpa.pdf">Executive Design Professional Agreement</a> The above Executive Design Professional Agreement is used with the Construction Manager Multiple Prime Delivery Mode of construction. The EDPA includes Exhibits and Certificate of Insurance.
Posted 12/05/2005
The above Statement of Qualifications Form must be signed by a responsible member of the firm applying for the project and submitted along with the Proposal.
Posted 12/05/2005
Finalist Letter
Posted 12/05/2005
The above Statement of Qualifications Form must be signed by a responsible member of the firm applying for the Project and submitted along with the Proposal.
Posted 12/06/2005
<a href="http://facilities.ucsb.edu/contracts/cmampt.pdf">Construction Manager Agreement</a>
The above Construction Manager Agreement is used with the Multiple Prime Trade Delivery Mode of construction. The CMA includes Exhibits and the Certificate of Insurance.
Posted 12/06/2005