UCSB DFSS Contracting Services
Back to list

Trace Metal Clean Laboratory Project (GC Prequal)

Posted 3/26/2018

Notes

All GC prequalification submittals received by the University were rejected. The University will revise the minimum qualification criteria and reissue the GC prequalification documents.

Posted 4/16/2018