UCSB DFSS Contracting Services
Back to list

Buchanan Hall Air Handler Replacement, Bldg. 573 (REBID)

Posted: 10/07/2020

Notes

The Construction Documents, addenda, if any, and other project related documents have been posted to the UCSB planroom at www.ucsbplanroom.com.

Posted: 10/07/2020


Attachments