UCSB DFSS Contracting Services
Back to list

Infrastructure Renewal Phase 1A

Posted 4/13/2010

Notes

The Bid Deadline has been revised per Addendum 2. The new deadline is Thursday, May 20, 2010 at 2:30 PM

Posted 5/04/2010


The on line posting does not include the Geotechnical Study Report or the Drawings.

Posted 5/04/2010


The on line posting does not include the Geotechnical Study Report.

Posted 5/12/2010


The University is in the process of evaluating the bid results. Bid results posted when the determination of award has been made.

Posted 5/28/2010


Basis of Award: Lump Sum Base Bid, plus all Unit Prices multiplied by their estimated quantities, plus the daily rate for compensable delay multiplied by the multiplier. Apparent Lowest Responsible Bidder: D-Kal Engineering, Inc.

Posted 6/04/2010


Attachments

Posted 4/13/2010


Posted 4/13/2010


Posted 4/22/2010


Posted 5/04/2010


Posted 5/12/2010


Posted 5/12/2010


Posted 5/12/2010


Posted 5/14/2010


Posted 5/18/2010


Posted 5/21/2010


Posted 6/04/2010