UCSB DFSS Contracting Services
Back to list

North Campus Faculty Housing Phase II

Posted 8/15/2011

Notes

<a href=http://facilities.ucsb.edu/contracts/nc/Precise%20Grading%20Plan%20Reveiw.pdf target="_blank">Precise Grading Plan Reveiw.pdf</a>

Posted 8/15/2011


<a href=http://facilities.ucsb.edu/contracts/nc/UCSB%20North%20Campus%20Faculty%20Housing%20SWPP-Amendment%20No2.pdf target="_blank">UCSB North Campus Faculty Housing SWPP-Amendment No.2.pdf</a>

Posted 8/15/2011


"INFORMATION AVAILABLE TO BIDDERS": UCSB North Campus Faculty Housing SWPP-Amendment No.2; Supplemental Foundation Design Recommendations for Post-Tension Mat Slabs; Precise Grading Plan Review; Updated Summary of Geotechnical and Environmental Evaluation of Proposed Import Site; Composite Topography reports are made available for the convenience of bidders and are not a part of the Contract. The information is provided subject to the provisions of Article 3 of t he General Conditions.

Posted 8/15/2011


The on line posting does not include the replacement drawings for Addendum Two.

Posted 8/24/2011


The University warrants only the Contract Documents in hard copy form. Copies of the contract Documents in any other form or media may contain inexactitudes, anomalies, errors, etc. In the event any of the contract Documents provided to the Contractor in any form or media other than hard copy are used or converted, the Contractor assumes all risks associated therewith.

Posted 9/01/2011


The University warrants only the Contract Documents in hard copy form. Copies of the contract Documents in any other form or media may contain inexactitudes, anomalies, errors, etc. In the event any of the contract Documents provided to the Contractor in any form or media other than hard copy are used or converted, the Contractor assumes all risks associated therewith.

Posted 9/01/2011


The University warrants only the Contract Documents in hard copy form. Copies of the contract Documents in any other form or media may contain inexactitudes, anomalies, errors, etc. In the event any of the contract Documents provided to the Contractor in any form or media other than hard copy are used or converted, the Contractor assumes all risks associated therewith.

Posted 9/19/2011


The University warrants only the Contract Documents in hard copy form. Copies of the contract Documents in any other form or media may contain inexactitudes, anomalies, errors, etc. In the event any of the contract Documents provided to the Contractor in any form or media other than hard copy are used or converted, the Contractor assumes all risks associated therewith.

Posted 9/19/2011


The University warrants only the Contract Documents in hard copy form. Copies of the contract Documents in any other form or media may contain inexactitudes, anomalies, errors, etc. In the event any of the contract Documents provided to the Contractor in any form or media other than hard copy are used or converted, the Contractor assumes all risks associated therewith.

Posted 9/19/2011


Apparent Lowest Responsible Bidder based on Lump Sum Base Bid plus extended amount of Compensable Delay and extension of Unit Prices. Apparent Lowest Responsible Bidder is Stronghold Engineering, Inc.

Posted 12/02/2011


Attachments

Posted 8/15/2011


Posted 8/15/2011


Posted 8/15/2011


Posted 8/15/2011


Posted 8/17/2011


Posted 8/23/2011


Posted 8/24/2011


Posted 8/24/2011





Posted 9/19/2011


Posted 9/19/2011


Posted 9/19/2011


Posted 9/19/2011


Posted 9/19/2011


Posted 9/23/2011


Posted 9/23/2011


Posted 9/28/2011


Posted 10/05/2011


Posted 10/14/2011