UCSB DFSS Contracting Services
Back to list

Engineering Research Center Restoration Project

Posted 5/16/2012

Notes

The cover letter attached to Addendum No. 2 erroneously indicates that the "Titles for all plans, specifications, or other related documents..." is “Harold Frank Hall Corridor Flooring Replacement, Bldg. 556.” A correction will be included as part of Addendum No. 3.

Posted 6/05/2012


Quincon, Inc. has been selected as the Apparent Lowest Responsible Bidder.

Posted 7/06/2012


Attachments

Posted 5/16/2012


Posted 5/21/2012


Posted 5/22/2012


Posted 5/22/2012


Posted 5/31/2012


Posted 6/05/2012


Posted 6/06/2012


Posted 6/15/2012