Back to list
SNARL Classroom/Lecture Hall
Posted 2/28/2014
Notes
Lowest Responsible Bidder: Peter Vander Werff Construction
Posted 6/10/2014
Attachments
Advertisement
Posted 2/28/2014
View
Download
Mandatory Pre-Bid Participants
Posted 3/12/2014
View
Download
Addendum No. 1
Posted 4/10/2014
View
Download
Addendum No. 2
Posted 4/10/2014
View
Download
Bid Summary - Blind Bid
Posted 4/25/2014
View
Download
Bid Summary - Final
Posted 4/30/2014
View
Download