Back to list
UCEN HUB INTERIOR REMODEL
Posted 4/28/2006
Notes
All Bids have been rejected. This project will rebid with a revised scope of work.
Posted 6/28/2006
All Bids Rejected. To Be Rebid. Reference UCEN HUB REMODEL - PHASE I, FM070003S/987656
Posted 8/03/2006
Attachments
Posted 4/28/2006
View
Download
Posted 5/11/2006
View
Download
Posted 5/24/2006
View
Download
Posted 6/01/2006
View
Download