UCSB DFSS Contracting Services
Back to list

Harold Frank Hall HVAC Upgrade Floors 1-5

Posted 9/05/2007

Notes

Addendum One changes the Pre-Bid Conference and the Pre-Bid Job Walk date to September 20, 2007 at 10:00AM.

Posted 9/06/2007


Addendum Two changes the bid opening date to October 16, 2007 at 2:30 P.M. The drawings for Addendum 2 are too large to post, avialable at Tri-Co 805/966-1701

Posted 10/15/2007


The University rejects all bids. This project will be bid again at a later date.

Posted 12/06/2007


Attachments

Posted 9/05/2007


Posted 9/06/2007


Posted 9/06/2007


Posted 9/24/2007


Posted 10/12/2007


Posted 10/15/2007


Posted 10/18/2007